DAM TOLUCA MEXICO

Installation of 10OPzV1000 battery banks Narada and reinforcement of the old installation with antiseismic rods to prevent the possible damage caused by the small tremors produced by the exit of the water.

Colombia Telecomunicaciones ESP S.A. (Movistar)

During the last six years Tempel Colombia LTDA. He advanced with Colombia Telecomunicaciones ESP S.A. (Movistar) 9 contracts whose scope includes transport, dismantling, supply and installation of 9871 battery Banks @ 48VDC in related references and capacities.

Powerdare UPS Battery Replacement

This project had as scope the supply and installation of the battery bank for the UPS node La Macarena One of the most important for the fixed operation in Bogotá.

DAM TOLUCA MEXICO
DAM TOLUCA MEXICO

Installation of 10OPzV1000 battery banks and reinforcement of the old installation with earthquake bars to prevent possible damage caused by small tremors produced by the water outlet

Colombia Telecomunicaciones ESP S.A. (Movistar)
Colombia Telecomunicaciones ESP S.A. (Movistar)

During the last six years Tempel Colombia LTDA. He advanced with Colombia Telecomunicaciones ESP S.A. (Movistar) 9 contracts whose scope includes transport, dismantling, supply and installation of 9871 battery Banks @ 48VDC in related references and capacities.

Powerdare UPS Battery Replacement
Powerdare UPS Battery Replacement

This project had as scope the supply and installation of the battery bank for the UPS node La Macarena One of the most important for the fixed operation in Bogotá.

10th Global Workshop on Energy and Climate Change
10th Global Workshop on Energy and Climate Change

Telefónica's Global Workshop on Energy and Climate Change is the annual meeting point between the company's energy efficiency and climate change leaders and its main collaborating companies in these sectors.